Power never sleeps

Real Energy.
Digital Performance.

Whoever controls the energy sets the pace of AI.

The bottleneck of the AI era is not the chip. It is the path between energy that is generated and energy that can be used. Aerion builds the infrastructure that occupies exactly that path — turning green power into its highest-value output, right where it is created.

01 · The paradox
300+ TWh

vanish every single year. Curtailment, congestion, negative prices — the cleanest power we ever produced, destroyed before it creates value. In Europe alone, three times what the Netherlands consumes.

The most efficient civilization in history destroys the cleanest energy it has ever produced. And almost no one asks why.

Every curtailed megawatt-hour is capital, burned before it can create value.

02 · The mechanism

No storage.
No transport.

The compute unit comes to the power — not the other way around.

The green line is the whole idea. When the grid says curtail, the Aerion AI Operator decides in milliseconds: this energy does not die — it is redirected on-site, into compute. No storage, no transport, no grid upgrade.

This energy does not die. It is redirected.

Twenty seconds between loss and value. That is the entire business.

Every saved kilowatt-hour: not promised, not estimated. Documented. Verified, in real time.

Digital Infrastructure
LIVE · WIETZEN, DE

Built where the
power lands.

4 compute unitsLive · In Production100% Founder-Funded

Four compute units run in production — integrated into a real wind turbine, governed by the Aerion AI Operator. Each unit operates in both grid states. Not a simulation. A working system.

Most ventures raise on a promise before anything is built. Aerion offers access to a system that already exists.

Built entirely with the founders' own capital — before a single euro was raised from outside. The energy partner isn't a supplier. He's a co-owner.

Compute

Compute.

The highest-value output today. Whatever the market demands, next.

Rows of purpose-built machines turn every surplus kilowatt into its highest-value output. The Aerion AI Operator does not commit to one fixed workload — it asks what this kilowatt is worth right now. Today the answer is compute. Next: AI inference and high-performance compute.

Today's compute is not the business. It is the proof and the entry ticket.

Built here. Deployable anywhere. Energy-intensive workloads, powered at the source.

04 · The coordination layer

One operator
coordinates it all.

The Aerion AI Operator governs access, prioritization and settlement across the entire network — one control layer tied to verifiable, on-site performance. Not a middleman. Not an overlay. The operating system of the infrastructure.

ACCESS — the operator opens the infrastructure: live telemetry, priority usage rights, advanced controls.
PRIORITY — When capacity becomes the bottleneck, the operator decides allocation in real time.
SETTLEMENT — Inside the network, every kilowatt is settled against its highest-value output: energy, infrastructure and software.

The operator is not an accessory. It is the master key — and the control center — of a self-scaling network.

Looking for returns? You are in the wrong place. Looking for structural access to energy infrastructure that has never existed in this form? Then you have found what Aerion was built for.

STEP · 01

The Compute Comes to the Power

Surplus energy is consumed at the point of generation — no storage, no transport, no new grid infrastructure. Modular, hardware-agnostic, with zero intervention in existing plant operations.

RACK ON-SITE
STEP · 02

Decisions in Milliseconds

The Aerion AI Operator processes four data streams in parallel: electricity market prices · grid signals · energy production data · hardware telemetry. The decision is autonomous, continuous, and never disrupts plant operations.

EPEX · €/MWh GRID SIGNAL TURBINE OUT NODE TELEMETRY AI
STEP · 03

Value Without a Grid

The Aerion AI Operator decides in real time: feed into the grid or activate on-site compute? Unlike conventional energy applications, value creation here is not tied to local market conditions — one logic, applicable across every site.

DECIDE GRID COMPUTE MILLISECONDS · ANY SITE
STEP · 04

From Stranded Power to Global Asset

Energy that is locally unusable becomes a globally tradable asset — instantly, without buyers, without sales, without grid upgrade. The only compute load on earth that monetizes surplus power from the first kilowatt-hour.

NODE COMPUTE GLOBAL
The moat

Compute, re-cast as energy infrastructure.

The advantage is not in the rack. It grows in the system behind it.

01

Energy Access

Direct integration into the plant. Power priced behind grid fees and levies — a contractually anchored cost basis no spot-market buyer can reach.

02

The AI Operator

Proprietary control software, trained on real load shifts. Harder to replicate with every operating day.

03

Operator Relationships

Access to wind sites is slow, local, trust-based. Whoever occupies sites early, occupies them for good.

04

Data Advantage

Operational curtailment data cannot be bought. It can only be earned — in live operations, over years.

05

The Flywheel

More sites generate more data. More data sharpens the operator. A sharper operator attracts partners. More partners mean more sites. Not a growth hope — the system logic.

A moat made of software, relationships, data and time — none of which can be jumped with capital alone.

How it works

From a wind gust to a settled kilowatt.

01

Integrate at the source

Aerion contractually secures 10–15% of a plant's output and installs modular compute hardware directly on site. No grid interconnection, no transport.

02

Decide in real time

The Aerion AI Operator routes every kilowatt to its highest-value output — feed the grid when it pays, compute when it doesn't. The same logic will route AI inference next.

03

Settle as a global asset

Locally unusable energy becomes a globally tradable asset — instantly, without buyers, without sales. Coordinated and settled by the Aerion AI Operator.

The scale of the gap

Numbers that don't round down.

9.4·
TWh curtailed · Germany 2024 · it's happening
€2.8B
Spent on congestion management · one year · it's costing
575+
Negative-price hours · 2025 · from 69 · it's escalating
+29%
Texas curtailment YoY · ERCOT · it's global

And the window to act is closing. Major transmission lines (SuedLink · SunZia · Marinus Link) come online 2028. What can be captured today, will be absorbed by the grid tomorrow. 2026–28 — the window of opportunity.

Rollout · Phased deployment

Not a promise on paper.
A system that scales.

Four compute units run live today — and a deployment model built to repeat. The Aerion AI Operator governs access, prioritization and settlement across every site. Capacity is added only against verifiable, on-site performance: no output, no expansion. Built and operated from Lower Saxony, deployable anywhere the power lands.

The earliest sites set the pace. The system compounds with every one that follows.

Pilot · Live now
4 compute units · Wietzen, DE
Live
Expansion · 2026
Second site · public performance feed online
Next
Scale · 2027
Multi-site rollout · AI-inference tier
Planned
Model · Repeatable · any qualified site

Indicative timeline. Phases and dates are illustrative and may shift with site availability, grid conditions and partner onboarding.

Aerion · In operation

Not a pitch deck. A running system.

The gap above is the market. This is the footprint already capturing it.

4
Compute units live today · Wietzen, DE
10–15%
Of each plant's output, contractually secured
1
Pilot site live · public feed in 2026
2026–28
The window before transmission absorbs the surplus
Access · Packages

Plug in at your scale.

From a single turbine to a full fleet — one system, priced to how far you run it.

Pilot 1 server
Free
  • Single-site compute integration
  • Live dashboard — read-only
  • AI Operator routing · Mode I base load
  • Real-time performance telemetry
  • Community support
Scale 10–50 servers
$350/ month
  • Everything in Growth, plus
  • Advanced controls + API access
  • Priority capacity allocation
  • AI-inference tier as it goes live
  • Dedicated onboarding
  • Priority support
Enterprise 50+ servers
Custom
  • Everything in Scale, plus
  • Custom SLAs & uptime guarantees
  • AI Operator licensing / white-label
  • Dedicated account manager
  • Custom integration & data export
  • 24/7 priority support

Every tier includes the Aerion AI Operator and real-time performance telemetry. Turbine counts indicate integrated on-site compute capacity. Prices billed monthly, excl. VAT. All onboarding is subject to a site feasibility review.

FAQ

Frequently asked.Fully answered.

Seven questions. Seven direct answers. Read in any order—or read straight through.

Read all nine answers Nine questions, fully answered. Nothing hidden behind click-to-expand.
Closing

Whoever controls the energy,
sets the pace of AI.

Whoever sets the pace of AI, defines the next industrial century.

Aerion has begun to set this pace. Whoever joins, decides now.

Built to be trusted Built & operated in Germany Pilot live · Lower Saxony Independently verified telemetry EU entity · UAB Aerion Energy