01 · TECHNOLOGY

The operating system for green energy.

Software for a new energy industry — designed to be licensed.

A dual-mode architecture that turns a wind farm into a programmable compute site — running high-value compute today, AI inference next. Coordinated by the Aerion AI Operator, proven on a live pilot, built to scale across locations.

↓ Scroll, or click any node on the map to explore the architecture.

04 · ARCHITECTURE

Not a reactive instrument.
A planned, dual-mode infrastructure.

MODE I — BASE LOAD

Structured Energy Access

Energy used directly at the generation site, contractually secured at 10–15% of output. Behind grid fees and levies — a structurally lower cost basis no spot-market buyer can reach.

Capacity share10–15%
MODE II — SURPLUS CAPTURE

Dynamic Scaling

When power is curtailed or prices turn negative, extra capacity activates automatically — energy that would be lost is put to work — as compute today, as inference tomorrow.

Decision latencyMilliseconds
Competitive in base operation · structurally superior on energy surplus.
04.5 · STRATEGIC TRAJECTORY

Aerion is not just another compute farm.
It is the software layer that turns every green kilowatt-hour into the highest-value output available.

The next industrial cycle will be won by those who control the energy AI runs on. Model architectures will become commodities, hardware will commoditize — energy is the only resource that cannot be replicated on demand. Aerion is the platform architecture that resolves this bottleneck.

PHASE I — TODAY

Strategic Anchor

Interruptible compute as the default load: instantly liquid, globally standardized, perfectly compatible with renewable volatility. Forms the operational base load — and the data advantage. Trains the Aerion AI Operator on day-one telemetry.

Asset class · Infrastructure
PHASE II — TOMORROW

Platform Activation

Wind, solar and biogas operators integrate. AI inference and HPC are added as a higher-margin premium tier — energy-intensive workloads, routed to the highest-value output in real time. Stationary storage becomes the time-shift axis. The AI Operator coordinates every output pathway.

Asset class · Platform
PHASE III — LATER

Software Dominance

The Aerion AI Operator is licensed worldwide to energy companies, municipal utilities and independent plant operators. Software margins replace infrastructure margins. Revenue decouples from physical footprint.

Asset class · Software
Whoever controls the energy sets the pace of AI.
infrastructure → platform → software
05 · ECOSYSTEM

A network that becomes
more valuable with every new participant.

Physical energy generation, proprietary software control and real-time coordination are three mutually reinforcing layers of one closed system. More locations generate more data → more precise control → more partners → more locations.

  1. 01

    Wind & Solar Operators

    Energy

    An additional, subsidy-independent revenue stream — 10–15% of capacity, contractually secured. Wind today. Solar, biogas and storage next.

  2. 02

    Site-Integrated Hardware

    Hardware

    Modular containers, hardware-agnostic, operated directly at the energy source — engineered for the noise, vibration and grid conditions of real wind sites. Zero intervention in existing plant operations.

  3. 03

    Aerion AI Operator

    Intelligence

    The real-time decision layer. Reads four data streams in parallel — electricity market prices · grid signals · energy production · hardware telemetry — and improves with every site, every day.

  4. 04

    Coordination Layer

    Coordination

    Access, prioritization and settlement across hosting, energy and software services — coordinated in real time by the AI Operator across every site in the network.

  5. 05

    B2B Partners & Operators

    Network

    Energy companies, municipal utilities and independent plant operators onboard via structured agreements. Each integration deepens the moat.

  6. 06

    Compute Demand

    Workload

    AI labs, hyperscalers and HPC users access compute at the source — energy-intensive workloads, routed to the highest-value output in real time. Settled at the source, paid in fiat. Phase II onward.

LIVE · PILOT SITE

The pilot is already
turning energy into compute.

LIVE · PILOT-01 · WIETZEN, DE
96.2 PFLOP/s
Active compute · on-site renewable feed
Compute units 4
Peak compute 154.6 PFLOP/s
Efficiency 13.0 pJ/FLOP
Energy source Wind · on-site
Status Live · Founder-Funded
Power draw Verification pending
Figures from pilot telemetry. A verifiable public performance feed goes live in 2026.
Pilot site feed
SITE CAM · 2026